OPEN PROCUREMENTS
RECENTLY CLOSED PROCUREMENTS
- RFP 190301 Landscape and Grounds Maintenance for Shenandoah University
- ROOFING SYSTEM FOR SHENANDOAH UNIVERSITY’S GORE HALL
- Ohrstrom -Bryant Theatre and Ruebush Halls IFB 170501
- Materials and Other Testing Materials for Shenandoah University’s Athletic Center
- Roofing System For Bowman Building
- Provide and Install Roofing System for Goodson Chapel
- Low Voltage Wiring; Caruthers House
Master Plan
IFB 150507 Shingleton Hall Dance Studio Alterations
- SKMBT_C30015043009570
- 215602-A1.01_ISSUE 150316 (2)
- 215602-A1.02_ISSUE 150316 (2)
- 215602-SPEC_ISSUE 150316 (1)
IFB Gregory Hall Alterations
- IFB 150506 Kinesiology Alterations
- 215601-SPEC_ISSUE 150420 (1)
- 215601-D1.01_ISSUE 150317 (1)
- 215601-A1.02_ISSUE 150317 (1)
- 215601-A0.01_ISSUE 150317 (4)
- 215601-A1.01_ISSUE150420 (2)
IFB 150505 Aikens Field House Alterations
- SKMBT_C30015041413460
- 215603-A1.02_150410 (1)
- 215603-D1.01_150410 (1)
- 215603-D1.02_150410 (1)
- 215603-SPEC_150410 (2)
- 215603-A1.01_150410 (4)
RFP Standing Seam Metal Roof Replacement
- #150501
IFB Roofing System for Edwards Residential Hall
- #150501
- ADDENDUM #1
- RFP 150301 Shenandoah University Perimeter Improvements
- Request for Proposals
- Utility Drawing
- Project Specifications
- Index Sheet Layout
- Detail Sheet Set
- Electrical Sheet Set
- Grading Sheet Set
- Layout Sheet Set
- Planting Sheet Set
- Perimeter Improvements – Exhibit A
- Perimeter Improvements -Exhibit B
- Perimeter Improvements – Exhibit C
- Addendum Knowledge Form
- Millwood Phase I Construction Project
- Audiovisual Systems for Health and Life Sciences Building:
- Audiovisual System Specification for Bidding
- Signal Flow Drawings
- Infrastructure Reference Drawings
- SU Quals and other forms
- SU Bidding Equipment List
- SU bid form
- Pre-Bid Meeting notes
- REQUEST FOR INFORMATION AND SUBSTITUTION REQUEST RESPONSES
- RFP 130707 – Potable Hot Water System for Parker Hall
- FB 130515: Roofing System for Gregory Hall
- Street Lighting 2013 RFP.pdf
- Street Lighting Specifications, Page 1
- Street Lighting Specifications, Page 2
- Information For Bid – Roofing System for Armstrong Hall
- Amendment #1 to IFB 120212 Roofing System for Armstrong Hall
- RFP 120212 – Asphalt / Blacktop Repair Services for Specific Main Campus Areas
- VMDO response to RFP 111011 Campus Master Plan
- CAMPUS MASTER PLAN (PDF)
- 2008-2013 Strategic Plan (PDF)
-
- Request For Proposal, Sarah’s Glen Plantings:
- Sarah’s Glen Plantings
- Attachment A, page 1
- Attachment A, page 2
- Attachment B
- Request For Proposal, Sarah’s Glen Plantings:
-
IFB #130909 Demolition of Specific existing space and new build-out in Armstrong Hall
- Primary Document
- Attachment A
- Schematic 1
- Schematic 2