Home » Blog » Look What’s Happening at Our Fairfax Location

Look What’s Happening at Our Fairfax Location

Construction is underway to enhance, expand ICPH buildings

Renovations continue at the Inova Center for Personalized Health, or ICPH, in Fairfax.

icphICPH provides a Northern Virginia/Washington, D.C.-metro area location for Shenandoah’s programs in:

The facility is ideally located in close proximity to Inova Health Care System’s Fairfax Hospital, and is perfect for students who prefer an urban setting.

The main entrance at ICPH, Tower 4, has been under construction since February 2019 and is expected to be completed in Spring 2022. For its exterior, new curtain wall window systems have been added to the tower and the pedestrian bridge. Once the interior of Tower 4 is complete, students will be able to relax and eat outside on the back patio and in a new seating area on the second-floor lobby. Inova is also adding a small coffee shop with grab-and-go items on the second floor of the tower.

icphThe adjacent Building C has also been undergoing renovations, with construction converting the former office building into a core and shell and awaiting future tenants on the second through ninth floors. Anticipated completion is Spring 2022.

The forthcoming Park3 Infrastructure project will provide a communal outdoor space between Buildings C and D and the conference center along the south side of the ICPH campus. This will give students the opportunity to walk outside to get to the fitness facility rather than the underground tunnel. This project will be completed in Summer 2022.

Currently, the conference center building’s Tower 8 is under construction to receive the same new curtain wall window panels as Tower 4. Interior construction of the first- and second-floor lobbies will begin in May 2021 and is expected to be completed in November 2021. Students are still able to access the fitness facility located in the conference center via the underground tunnel. The center’s cafeteria is currently being used as a vaccination clinic. In the interim, breakfast and lunch can be purchased at the Inova Schar Cancer Institute’s Café (located two buildings down from the classrooms).

Categories: ,

Recent News

Harambee Gospel Choir sings during the Martin Luther King Jr. Service of Remembrance in Goodson Chapel-Recital Hall.

Celebrate The Legacy Of Dr. Martin Luther King, Jr.

Join Shenandoah University for a day of service on Monday, Jan. 19

Shenandoah students take a selfie with a lake in the background.

Five Shenandoah University Students Participate In Sullivan Foundation’s Ignite Retreat

Valeria Perero Santa Cruz ’28 also selected as Sullivan Fellow

Gameplay screenshot of Lewis & Clark VR showing a map and tables

Shenandoah University Releases ‘Lewis and Clark VR’

Shenandoah Center for Immersive Learning’s New Educational Virtual Reality Experience Follows The Famous Cross-Country Expedition

Jennah Elganainy takes a photograph in wetlands with a sunset sky in the background.

Shenandoah Film Production Student Completes Wildlife Reserve Internship In Zimbabwe

Jennah Elganainy ’26 Captured Wildlife Photos, Video For Antelope Park

Monthly Archives